欧美一区二区三区高清版播放精品_午夜精品久久久久久久99桃_亚洲中文字幕人妻系列_边吃奶边下摸的视频_欧美精品一区三区中文字幕_两个人免费观看的高清视频_国产亚洲欧美精品综合在线 _亚洲av国产aⅴ精品一区

News

The company will uphold the purpose of mutual benefit and win-win in the future,

If you are interested in our service, you can contact us directly, looking forward to working with you!

News trends

Drip irrigation sprinkler equipment performance and installation steps explain
Release time:2024-05-08      Number of clicks:80

In the dry season, large-scale intelligent sprinkler equipment began his work. Today, I will explain to you the role of drip irrigation equipment, the use of places and installation steps. Hope you want to know some help.

The installation of drip irrigation system can be divided into eight steps: trenching, pipe installation, water pressure test, trench backfilling, nozzle installation, pressure equipment installation, other equipment installation, system debugging. Note the following during installation:

1. Trench digging: trench depth should meet the requirements of equipment installation, external pressure and winter drainage; Keep the groove as narrow as possible; The groove should be straight, and the slope of the groove bed should be as far as possible to the valve well or the drainage well; The excavated soil can be stacked in layers on one side of the pipe trench; There should be no hard debris in the trench; When digging a trench, the trench depth should meet the pressure requirements of the roadbed.

Second, the installation of sprinkler irrigation equipment pipeline: before installation need to check the pipe fittings, eliminate deformation, cracks, damaged products; Cross pipe and slot bed should be combined well, do not hang; The installation Angle of standpipe should meet the design requirements; When multiple pipes are in the same ditch, try to avoid overlapping of different pipes; When the working pressure of the pipe network is large, strengthen the concrete pier for the elbow and tee as much as possible.

Third, pressure test: pressure test is a more important part of the pipeline installation work, in order to detect the tightness of the pipeline connection. During the test, the test pressure should be determined according to the working pressure of the system design, and the test should be carried out in strict accordance with the relevant technical specifications and the test record. During the test, keep away from valves and fittings when performing pressure and balance tests.

Fourth, trench backfill: After the pressure test of the pipeline is qualified, the trench can be backfilled. First backfill about 10cm thick sandy soil, and then fill in layers. If the excavated soil is stacked in layers, the backfill should also be sequentially layered and backfilled.

5. Installation of sprinkler head: Before installation of sprinkler head, water should be flushed out all dry pipes and branch pipes to remove sediment and foreign matter in the pipe to avoid debris blocking the sprinkler head. The height of the nozzle should be level with the ground; The installation position of the sprinkler at the boundary of the irrigation area and special points should consider the rationality of positioning to prevent the problem of leaking or spraying out of bounds.

Pressure equipment: pressure equipment is the heart of the pressure type sprinkler irrigation system, if there is a failure, the entire sprinkler irrigation system will be paralyzed, in the installation, need to be careful. Commonly used pressure equipment are all kinds of pumps and constant pressure water supply devices. When installing the pump, the stability of its work should be considered, and the appropriate foundation should be selected. The concrete structure can generally be used as the ideal irrigation pump foundation. Install a vacuum gauge near the inlet of the pump and a pressure gauge near the outlet to check the running status of the pump. The installed motor should be matched with the water pump used, and the appropriate cable should be selected for connection.

Other equipment installation: Other equipment refers to a variety of manual and automatic valves, controllers, sensors and other control and auxiliary equipment. When installing such equipment, the installation instructions and precautions should be carefully read, and the installation joint should be waterproof after the installation of the appropriate wire.

8, system debugging: After the installation of the entire system is completed, it is necessary to adjust the system and other tests according to the design and equipment technical documents, and the test results can be formally delivered.

Sprinkler irrigation equipment is an irrigation method that sprays water with a certain pressure into the air by means of pumps and pipeline systems or by using the drop of natural water sources, dispersing it into small droplets or forming mist to fall on plants and the ground. Sprinkler irrigation system from the source of water and transport, distribution to the field, the implementation of spraying irrigation water facilities. It is composed of three parts: water source engineering, water distribution channel or pipeline and spraying machine.

News you are interested in
Previous:How to identify the quality of the sprinkler?
Next:NO!

Return list

The company warmly welcomes friends from all walks of life at home and abroad to visit and cooperate

Jiangsu Zhongshui irrigation and drainage equipment Co., LTD

Tel: +86 0516-85227526 89682866 13505225915

Fax: +86 0516-89682866

Technical service hotline: +86 0516-89611588

Address: East of West Winery Road, Peixian County, Jiangsu Province

Zip Code: 221600

E-mail: jszhongshui@163.com

Website: http://tjjindun.com

大关县| 南充市| 远安县| 宁陕县| 阳新县| 维西| 瓮安县| 德清县| 绿春县| 旺苍县| 开阳县| 广宁县| 安平县| 台南县| 同心县| 句容市| 抚远县| 万全县| 青田县| 新沂市| 邯郸县| 贵港市| 阳原县| 昌平区| 高碑店市| 大兴区| 中山市| 巴中市| 石泉县| 陈巴尔虎旗| 墨脱县| 赫章县| 称多县| 莱阳市| 伊春市| 佳木斯市| 内乡县| 五常市| 阳东县| 沂源县| 吉木萨尔县|